>>965986>5 more yearsBy this I mean:
1. Santa Monica Expo Line (already finished and opened)
2. Regional Connector (downtown LRT subway) opens 2019
3. LAX/Crenshaw line opens 2019
4. Southern California Regional Interconnector Project (LAUS run-through tracks) opens 2019
5. UCLA subway could be a thing by 2022 if Measure R2 is put on the ballot and passed.
6. Long Beach Green Line could be could be a thing by 2022 as well if Measure R2 is put on the ballot and passed.
Basically, LA is on the move transit wise and is building. This is better than what the Bay Area is doing.