>>1138040I would assume directly underneath the EC platforms, but obviously it is impossible to say considering the "DRL Long" plan is still in its very early stages.
>>1138042No Kennedy is the only other station on the east end of the line that will be underground.
>>1138067Nope. This is because the subway and LRT will have center platforms so its impossible to build a connecting tunnel between the two at that level. Instead to transfer from the BD to EC you will need to go up 1 floor to the mezzanine than back down to what ever platform you are transferring to.
Pic related is the plan for Kennedy. As described above you will have to walk up to the mezzanine level to transfer between Line 1, and 5 (as well as head up stairs to the Buses and Line 3 like we currently do).