>>1445692Not anytime soon. It along with part of the Finch corridor was planned to be used by the Etobicoke RT. The plan however was dropped because the SRT plan was changed to the one we have today and it didn't work out the way the Province said it would. The only portion of the Etobicoke RT that was built was the streetcar platform at Kipling (which irrc is gone now). We don't know much about the plan, but from what we do I put together a little map to show what it may have looked like. Its also worth noting that at the time Metro Toronto was planning the Etobicoke RT, the Province was also looking at utilizing the same corridors for it GO ALRT project.