>>1466721there's work happening on the north part from the bridge behind Ansley Mall and north through the neighborhood. mostly grading but behind the mall is all that water so there's a bunch of drains getting installed. they haven't gotten as far as the big multi rail corridor next to marta line yet and I can't figure out how they're going to get over that. Marta goes overhead on a bridge but freight tracks are ground level.
south side is getting graded west of Metropolitan Parkway.
there's still a lot of raw, old trail on either side of where they're working.
t. I scouted all this out last week