>>1355078>Interesting. What explains the variation?I'm not infrastructure autist, but I'll try to explain.
In 1,5km/8mil case they only have to lay down rails and add electric grid.
In the second case first you have to distract price of trams (approx. 2.2m per piece) form total cost: 105-(2,2*18) ~ 65,5 m. Additional cost goes to:
1. they have to build bridge over small canal
and overpass over 4 lane road
3. they will have to arrange, up to 80 meters wide greenbelt, around tracks.
4 Build sidewalk, bike path, exercise gym, pedestrian bridges and so on.