>>1211534Something like this would be possible if you really want to share track. Total track length would be similar to T-bone's proposal, can still serve about as much passengers, while continually giving Dallas-Houston passengers the fastest trip time. Passengers from Austin will also have a similar trip time to both cities as in the T-bone plan. However this plan will still have a bottleneck leading to the inability to utilize the full capacity of the Dallas-Houston track and is thus less desirable than TCR's plan.