Quoted By:
Which was why the early ones were delivered with pantographs and couplers. Because beside the single car operation they were to be used as multiple car trains in Scarborough.
Should be being used as such right now in the Rail Right of way right beside the GO trains as a Downtown relief line but nope they are scrapping them instead.