>>1299012So:
The branch line in question is the Ramal Villaverde-Orcasitas
https://translate.google.com/translate?sl=es&tl=en&u=http%3A%2F%2Fwww.ferropedia.es%2Fwiki%2FRamal_de_OrcasitasWhich currently has three properly indicated level crossings, is limited to 15km/h circulations and sees TWO trains per week at most.
Yet the NIMBYs complain about this, because it stops their cages for five minutes while the train passes through. What makes this even funnier? The NIMBYs themselves pushed for the Metro line to be extended down to here, yet of course don't fucking use it!
Of course, the logistics center will be built right next to the train track, where there was already some industry around a decade ago. Of course, they don't want this, because their cages would be stopped even more times per week, maybe even every day for five fucking minutes! And they're using the typical excuses that I've listed in the previous post.
These people want industry and jobs, and most of the time are complaining about outsourcing and foreign products being inferior. Yet you give them industry, and they don't want it because it makes their houses devaluate and their cages (which they don't use for long journeys, since the main accesses to the highways aren't even affected by these level crossings) get stopped for five minutes.
It's all so fucking tiresome, /n/.
Pic is one of the level crossings in its current status. Not pictured are the vehicle barriers, which are there and working.