Quoted By:
First Florida tower segment rolled out last night. LR 11350 crane mostly assembled to start lifting tower pieces.
Base of the Florida tower has been redesigned to incorporate the draw works rather than having it as a separate steel structure. The tower segments are more kitted out than for the first tower with the elevator bits and cable trays pre-installed.