Quoted By:
The only at-grade section is 6.4miles/10.3 kilometres along MLK Jr. Boulevard.
Total system length is 32.75 kilometres.
So its not an inconsequential segment of the system. Elevating that section would probably have added like $1 billion to the cost of the initial line.
Sadly, it will constrain the system in the future.