[50 / 9 / ?]
How does one determine when crossing a canal should be done with a bridge going over or a tunnel going under? I ask because of pic related, which likely cost over a billion more then it otherwise would have because the government wanted a fancy bridge that went over the St Lawrence seaway rather then making a mile long tunnel going under the seaway followed by a 2 mile low to the water bridge like the Victoria bridge.