Quoted By:
Nevertheless, one frame Must be operational in three months. Even if the other two must be cannibalized for parts, limbs, and functional systems.
It would take a month to disassemble two of them, at least another month to actually cobble a working, functional frame out of the pieces, and would leave a bare month for trying to trial and fix up additional systems.
That only left the question, which Core and Pilot would be deployed in this hybrid frame?
The only thing that could decide that, is more testing.
And hope that whatever comes out the other end is good enough to impress High Command.
The doctor calls over his lead engineer.
“I need your best estimation over how fast we can disassemble those two frames, and reassemble a fully functioning frame out of that one. On double shifts.”
>No vote yet, but I'll have one tonight.