>>7797557In the mean time I finished the parking lot/loading area by adding gravel and wood flakes.
In this scene the shunting loco is pushing a wood car on the loading track, while the main Diesel loco and a couple of gravel cars wait.
The whole set up is powered by a Märklin digital system running in AC.