>>10471913The industry isn't on the main, so shunting it would only block the branch line, if at all, due to the extremely long runup towards it.
As far as tehe station, I think I can sneak a couple of crossovers in, and I could probably expand the peninsula it's set on to help do that. One of the issues that plagues Unitrack however is that most turnouts require some spacing between them and any curves to avoid derailing, so they need more space.
Might avoid many of those issues by just using flex track and Atlas turnouts, but AFAIK Kato is the only manufacturer making a factory assembled double crossover, and I don't want to mix track systems if I can avoid it. I know Fast Tracks makes an assembly jig for both a #6 and a #8 double crossover, but it's limited to code 55 rail.